Label Cloud

#FNSI #FridayNightSewIn 1 a week challenge 1930's 2011 48 Weeks 9-11 Accuquilt allergies Angie Tedder apron arrow cabinets asthma aunt baby quilt backing backup baking basting batiks bday becca reads the bible Best Friends Bible binding block lotto blogging blue BOM Bonnie Hunter borders brownies Bubba Bubby Build a Better Backside buttons camp car seat challenge Christmas Christmas Quilt-A-Long church church group clean color challenge comfort computer contest cookies cooking corvettes for kids Cowboy Rodeo cutting dad daily giggle denim and co. design design wall dessert Dillon dillon's critters DM donation dreams DWM easy election day EQ7 ergonomic eye candy fabric purchase Fabric Shack fashion mate 237 FB fear Fedex finish first post flu FNSI friday night sew-in Friday night sew-out friends Frisch's giveaway go cutter goals gold coins google gospel graduation gym health help hem hobby lobby house HRB Husky i spy ink jaybird quilts Jennifer Jesus Jill joann's John Carr judy Judy L kitchen label label cloud Linda LQS LRC machine magazine mail matey memories moda bake shop mom movies music nap Natalie New Year's no-sew fleece blankets NQD organization oven pain panel paper crafts pclassic BOM PIF pillowcases pincushion pioneer woman plan plants prayer request printer purse q4k QAYG qfirstKY quilt group Rachel's Sunshine rag quilt rant recipe report resolutions retreat roommate safety pins sandy's SBS school serger Sew Mama Sew sewing desk sewing for others shipshewana shopping sick Star Struck Start-to-Finish Stash Stash Pot Pie stash report sunbonnet sue surprise survey swap swaps Tammy Tadd techniques Thangles thanks towel townhouse traffic trominoes ufo UFO challenge 2011 vbs vidoe Virtual Quilt Day vote walmart wasps waun-a-finish waun-a-quilt waun-a-start winner WIPs WOBQ work wv YBR yellow you can quilt this out

Tuesday, August 21, 2007

New Sewing Machine!!!

Husky broke Friday evening. (That's the name I've given my mom's old machine - a Husqvarna 990 SLE). She's in the sewing machine hospital as I type. However, on Saturday, I found Matey!!! Matey is a Singer Fashion Mat 237 M.A. I picked up her a yard sale for $10.00. The guy said it worked. It had the base and the lid, though one of the clasps on the lid is missing, so I'll never be able to carry her with the lid. That's okay. I'll like never be carrying Matey because she's so heavy!!!! But after fiddling with the threading and the tension she works!!!!! And, she's got a 1/4" presser foot :-).

My other machines, so they don't feel left out, are Kenny (A Kenmore Min Ultra) and Sergie (A serger ... can't think of the brand/model off hand.

I finished the skirt! I was working on the seat pockets when Husky threw her fit :-). I'm working on the SBS blocks on Matey. --- it's nice having a 1/4" foot.

Well, all for now,
~~ QB29

Tuesday, August 07, 2007

Let's see, what have I been doing???

Since I last posted I have finished two of my HRB classes. This week will finish up another class. After that I just have three more classes to go (Sole Proprietor, Retirement Plans, and ITIN). Then I'll be done with that until pre-season training and update :-). At least now I'm done to once a week (except for the ITIN week, but that's only a one night deal). No more 3 nights a week comprehending tax issues :-D.

But this blog is about sewing and quilting ... so onto the good stuff. It's been two weeks plus since my last post and I feel like I haven't accomplished much of anything!!!! I'm still quilting blue & yellow 1930's baby quilt. I still need to finish cutting the train quilt for the special 1 year old. I did pick up fabric for a sheep quilt for his new baby brother, but again, that still needs to be cut.

I did manage to make pillows for sis for Bday. As I can use coupons to buy the forms, I'll have them finished. I ended up cutting the big ones too big, so I need to trim them down to fit the pillow form. A really neat trick that I found out at class (more about the class in a minute) - for pillows 14" or bigger, make the cover 1" to 2" smaller. So for a 20" pillow form, make it 18". The pillow cover fits nicer then. It doesn't work for 12" or smaller though. I just need to buy one more pillow form for her.

The other night I took a pillow class at the local quilt store. We put the back in the front and added a cute button and loop. It looks cool. I'll post a picture of it one of these days. (yes, I do have a camera ... I just don't take pics and when I do actually take them, they sit on my camera forever :P.

Tonight I have a free night ... if I can get out of work. It's a crazy start to the month :-( and I may need to stay late. I need to finish my SBS blocks. I've got 7 whole sets to do and one partial. I still need to label/sign for all of them too.

My sewing class with mom on Saturday was cancelled. We were the only ones signed up for it. Mom told the lady I was coming in from out of town but it didn't help any. Oh well, one less project to do ... not like I'm lacking at all, well, maybe time, but not projects. Definitely not projects.

This week I hope to get 6 sets of SBS done, leaving me with just 2. I also hope to finish the pillows as I buy the pillow forms and to finish 1930's baby quilt. I know, I'll probably be listing this again next week, but I gotta aim for something.

All for now
~~QB29

Sunday, July 22, 2007

Weekend Notes

Let's see ... yesterday was a long day. I was up by 6 so I could be at WW at 7 (I decided to join - I've got a lot of weight to lose and the Dr. recommended them) for the 7:30 mtg. Then I was off to Ethics class at 10. Then to the store as soon as my test was handed in and graded (100 % :-)). Then home barely in time to pack for "all night quilt"
It started at 4, but I got there around 4:30. There were four other ladies. The owner of the shop T., an instructor for the shop, S., a lady by the name of J., and one by the name of L. Another L. arrived shortly after I did. It was fun.

We chatted and sewed and looked at fabric to see what would work for a new pattern (to me anyway) that she is teaching called "One Block Wonder." It is out of a book - I don't know if that is the name of the book or not. It is similar to a stack and whack method. You take 6 repeats of your fabric. Stack them up exactly on each other and whack away. You cut it into triangles and then put them together in hexagons so it's sort of like a kaleidescope pattern. She had two samples in the store and they looked really awesome. I might take the class if I can fit it into my schedule. It is Sat. Aug 18th and takes all day. Sweet, then the All-night quilt occurs :-).

We ordered pizza. The poor pizza place had to come three times. The 2nd L. made it too late to order with all of us as our order was already on its way. Then they messed hers up so they had to come back to replace it.

I was pooped from running all day and having a long week so by 9 I was packing up and heading home. It was cool though. I plan on coming every month. It is always the 3rd Saturday of the month. Several of the ladies meet on Thursdays to sew. Some of them are there all day. Some arrive after work and stay until the store closes at 7. I just might have to start doing that when I don't have class. Cool - more quilting time!!!

I got most of the stuff cut for the special one year old. This week I really need to work on his and on quilting (for the 3rd time) the 1930's blue/yellow quilt. That baby was born this past week. No, I still haven't uploaded pictures. I promise I will sometime soon though.

Shopping was good. I spent way too much of course. But I now have all fabrics for dad and sis. I got backing for special 1 year old and picked up a coordinating white to use as the train backgrounds. I also got backing for Pastor's baby girl and several F.Q.'s. I also picked up a Christmas panel. So now I just am looking for w.o.w. for SBS blocks (I completely forgot to look) and whatever novelty/coordinating prints I get for special one year-old's new baby bro, and coordinating fabric for the Christmas panel to make a throw.

My goals for this week are:
1. frog, baste, quilt, bind, and label 1930's quilt and give it away.
2. finish cutting, piece, baste, quilt, bind, and label special one year-old's.
3. shop!!!! - sbs blocks w.o.w, new baby bro, and Christmas panel coordinates.
4. Rest, relax, and have fun :-). I think I can do this one. Well, maybe the have fun part. I don't know about the rest and relax part. I never seem to find time for those :-D.

Well, I best get out of here (I came in to work some - but the printer is out of ink :-().
~~QB29

Wednesday, July 18, 2007

Just Because

This is a just because post. I'm looking forward to one or two hours of quilting before church tonight and one or two after. I've got June Baby Boy's ready to go - I just need a gift bag and a card. So I'll be making a quick run to the dollar store after work. They've always got cute stuff there.

I hope to get July Baby Boy's basted and maybe even quilted tonight. :-)

Bye bye,
QB29

Finished June Baby Boy!!

Last night I finished June Baby Boy's quilt. I took pictures but left my cable at home. I'll post them later this week when I have a chance to upload. Speaking of pictures, I also have some train ones from my nephew's quilt to upload. Hopefully I will get all those uploaded by the end of the week.

I cut all my fabrics for dad that I had. I was going for a red/brown/gold scheme, but I think some of the reds are too close too each other. I might add in some of the darker neutrals and just use the lightest neutrals for the outline/backing. I may also need to add in like a blue or a green. We'll see.

I dug through my F.Q. and found 4 that are suitable for sis's throw. I also had about 5 or 6 9" X 11" pieces that I can get some extra blocks out of to use.

I did get my labels for SBS and dad's blocks printed. I cut the SBS ones this morning and just need to finish cutting the ones for dad. To help me piece the blocks correctly, each fabric is assigned a number and each block is assigned a font. That way I'll be able to tell at a glance if everything is right. I printed off a 16 X 16 puzzle to use as my pattern.

Tonight I hope to baste, quilt, and label July baby boy. That will just leave binding to be done later this week. I also need to recolor my design for the special one year old and cut the rest of his fabric.

The rest of my "later this week" assignments are the same. :-P

All for now
~~QB29

Tuesday, July 17, 2007

Quilting Life This Week

I'll be pretty busy this week, but I hope to squeeze in a lot of quilting. Each evening this week I've got at least a two hour commitment (class/church/platelets) which will limit my sewing and quilting time. But I am trying to look at each project in baby steps (go FLYlady!) For June baby boy I just need to finish binding the quilt and then label it. I've decided on my "baby quilt label" -

A special baby, sent from Heaven above,
An answer to prayer, given in love,
A gift to be treasured, welcomed with love.

Made for _________ by __________ on (month year).
"Lo, children are an heritage of the Lord." Psalm 127:3a

So tonight I plan on getting that taken care of for June baby boy.

I also need to finish cutting the fabrics for my dad and label each one. His quilt is a sudoku style quilt. I still need two more fabrics for the blocks - I've currently got 14 but I'm doing a 16 X 16 version. One of the fabrics I'll actually get yardage out of so I can have a matching border. I may need to pick up some more neutral as well. I'm trying to decide if I should do a quilt as I go method, so I would have a 4 X 4 pieced back + borders, rather than just quilting after the top is finished. That idea is attractive to me, as I want to learn the method. Doing so would kill two birds with one stone so to speak.


Later this week I plan on:
1. basting/quilting/binding/labeling July baby boy quilt (the 1930's blue/yellow top)
2. piecing and basting the train quilt for the special 1 year old.
3. piecing a yellow-brick road girl's baby quilt for my preacher's little one due in Oct. I did all the cutting I could do before sewing last night.
4. cutting & piecing all the SBS blocks I've got fabric for (I think about 6 or 7 more - I need fabric for just one set I think)
5. Labeling and adding signature blocks to all my SBS blocks. I'll need 50 total.
6. Shopping!!!! Always a fun time. I need backing for the train quilt. I also need all the fabric for that little boy's new baby brother. I need to pick up a little bit for the SBS blocks. I also need to get the coordinating F.Q. that match Beth's fabric for her pillows. I think one or two from my stash will work out. Luckily the store closest to me is having a 30% off sale.
7. Washing and pressing all my new fabric.
8. Basting throw for mom. She's hinting that someone could make her a quilt. Well, won't she be surprised when she doesn't get it for her birthday. Hee, hee, hee. I want to give her the placemats for her birthday so she can actually use them this holiday season.

So I've got a busy week coming up!!!! Not to mention 12 hours of tax classes. :-D. Gotta love the off season. Luckily Saturday is the "All Night Quilt" at the store here in town, so I'll have some time to work.

Next Saturday we're going to see the cousins ... and you know what that means ... even more shopping ... the Fabric Shack :-).

All for now,
~~QB29

Monday, July 16, 2007

Sew-sew weekend

I had a sew-sew weekend. I ended up being lazy Friday so I really got nothing done. I finished knotting Bubby's quilt and gave it to him on Sunday. Sis was able to change plans with his daddy so I could see him :-D. He took his afternoon nap with it, so I'm hoping he likes it, lol. You never know with a nine month old.

This week I really need to get the 1930's blue/yellow baby quilt basted and quilted. July baby boy was due this weekend. I also need to get the top pieced for the special one year old. I still need to buy fabric for his new baby brother. I'm not sure what I'll do. A store in town here is having a 30% off sale Saturday so I'll decide in the store. I still need to finish June baby boy. I did work some on the binding, but I need to finish that as well as add a label. That I need to do tonight or tomorrow so I can leave it at church on Wednesday.

Saturday is the "all-night quilt" thing at another store here in town. I'm looking forward to it. This week I hope to get several things prepped to work on at it - the 1930's quilt to the binding stage, the special boy basted, the new baby brother cut. That will give me a quilt to bind, one to quilt, and another to piece on Saturday. That should keep me busy for a few hours :-).

Sis did pick out some fabric for her pillows. I hope to get coordinating prints to do a throw for Christmas. The pillows will be for bday.

Well, all for now
~~QB29

Friday, July 13, 2007

Worked on Swap Blocks!

Last night I finished two sets of my SBS swap blocks. Just eight more to go! Tonight is a free night for me so I plan on getting two to four more sets finished. I also plan on basting July baby boy tonight, machine quilting, and attaching the binding to the front. That will give me two quilts to bind/knot loose threads while away from my sewing machine on Sunday. Saturday is the all-day tourney for softball so I will be manning the concession stand all day long. No quilting/sewing for me :-(.

I won't get to see Bubby after all. He's already promised to his daddy and other grandma for the day. But sis said she'd be able to get together with me to go fabric shopping. I'll just have to give her the train quilt instead of giving it to Bubby (like he knows yet what to do with a quilt - the little guy will just be 9 months this weekend).

I signed up for the pillow class, but the supply list was not ready. The lady teaching the class is out of town 'til next week so I have to call on Wednesday to get it. I liked the sample pillow. I'll have Beth pick out some fabrics and just do some patchwork pillows for her. If I can find a similar/coordinating print I will make her one of the class ones. Who knows, I may be able to get enough extra fabric/coordinating prints to make her a throw for Christmas. That's an idea.

Since I won't see June baby boy until Wednesday I'm not worried about finishing his quilt tonight.

I did look into the rag quilt class that I thought was interesting, but it's a flannel/home spun type of quilt, which is not what I was wanting. Oh, well. The sampler class looks interesting, but it's $270!!!!!! You meet 1 on 1 with an instructor for your first session. After that you meet the first Thursday evening or the first Saturday morning of each month. Class time is devoted to discussing problems/issues/techniques. You hand-piece one or two blocks a month. You can finish in a year if you do two blocks a month. You pay $90 when you sign up. At that time you get 15 yards of fabric, which is enough to do a queen size quilt. Then after you finish the first 8 blocks, you pay the next $90. You pay the final $90 after finishing 16 blocks. So I will either be paying $90 every four months or every eight months. I'm thinking about it. It was a lot more than I expected it to be.

Well, I guess that's all my updates.

~~QB29

Thursday, July 12, 2007

Not really about Qullting

VBS has been going well. We had about 48 girls ages 5 - 8 last night for crafts. They liked doing the frames. They had to decorate the foam frames with foam stickers and use an additional sticker to adhere the ribbon on the back for hanging. Each girl got a picture of the race car to put in the frame.

I did not get home until late last night so I got nothing done. I noticed last night in the car how the seatbelt hits R in the ear so I purchased two boosters seats after dropping them off so both R and F will have one to use in my car. After I got home I had to switch the car seat to the middle and put both boosters together and put in my car. I'm not sure if it will work or not. There's practically no space for a little hand to buckle :-(. F may just have to ride in the middle where there is only a lap belt while R uses the booster with the shoulder harness.

I talked to mom just a bit ago and it looks like I might get to see Bubby this weekend. Sis would like me to make her pillows, but wants to pick out the fabric herself. There is a class coming up down here that I would like to take but I'll need to get together with Sis beforehand to buy the fabric. If I can do that Sunday I will be very prepared for the class.

Since there are no crafts tonight I should have some time to work on the quilt for Little June Baby boy. I saw him last night as his momma was dropping off big brother for VBS. He's a cute little guy :-).

All for now,
~QB29

Tuesday, July 10, 2007

Binding Done!!!!

I finished the binding on the Train Quilt last night!!!!! Knotting it off will be my downtime tonight!!!

VBS went well. We had about 30 girls ages 5 - 8 for crafts. Two other ladies and I are doing that age group. Last night we had them make American flags out of construction paper and stickers. They liked it. Tonight they will be making book marks. We will have stickers and colored pencils/crayons/markers for them to decorate them. We also will have eyelets to use to make the hole and ribbon to tie on them. MJ is printing off the Bible verses for the week in several different fonts for the girls to glue on the book mark.

Tomorrow night we will do foam photo frames. I made 28 last week, but it looks like I will need another 10 or 15 more. I've got the supplies at home to make another 30. I will make enough tonight plus 10 for the number of girls we've got tonight. They will be putting foam stickers on the frames. Then we will hole-punch the frame and add a ribbon for them to be able to hang the frames on their wall. We are printing off a picture of Bro. D and the race car for each girl to put in the frame. BTW - it is a race car theme. Depending on how tonight goes I may have to stop and buy some more foamies. I may also buy some markers or other stuff to make it last longer. Craft time is about 30 minutes.

Back to quilting. My registration is in the mail for the camp in the fall. Four whole days of nothing but quilting (okay, eating too) - what a wonderful trip :-). I also called and found out about the all-night quilting a local store does. The third Sat. of each month they meet about when the shop is closing (3 - 4pm) and quilt until late. They take a break around 7 or so for supper. What fun!!! It's on my calendar. If it's a friendly group I'll plan on going every month :-D.

Tonight I plan on knotting off the train quilt. If I have time I'll start on the binding on Paddington. I'm having J and the kids over for supper before VBS so I won't have time to work on quilts between work and VBS, but that's okay :-D.

All for now,
QB29

Monday, July 09, 2007

Got some stuff done!

Well, I got some stuff done over the weekend. Only 1 more softball weekend and then we're done until the fall :-). I'll get my Saturday's back!!!!! Which means more quilting!!!!!!

Let's see, despite being at the ball fields about 6 hours, I did piece and quilt the Paddington Bear quilt for June baby boy. As long as I take my time basting and keep the layers smooth and tight, it turns out good! I've got the binding attached and just need to hand finish it. I also need to label that quilt still. Train quilt for my nephew still needs to knotted off and the binding finished. I've got both of those quilts with me, along with thread, needles, and scissors to work on this afternoon and tonight when I've got down time. VBS starts tonight so I probably won't get much accomplished quilt-wise.

I also frog stitched the yellow and blue 1930's baby quilt I started a few years ago. It was my very first attempted at machine quilting (way before my walking foot). I never finished it because I did not like how the quilting turned out. Now it's ready to be basted again. I rinsed out the top and backing to help the stitching lines disappear. I've got it piled on my quilt frame - along with the purple and white quilt and a cowboy themed quilt. Both of those I started by hand awhile ago and plan to finish this summer for two upcoming babies. The purple and white one will go to an Oct. girl while the cowboy one will either be an extra or will go to a Jan. baby if it's a boy. The dad's into cowboy stuff.

Besides finishing the Paddington Bear Quilt and the Train quilt for my nephew, I hope to get the yellow/blue baby quilt re-quilted and finished. That baby is due this week. After that, the next two quilts I plan to work on are train quilt #2 and green/black/yellow animal quilt. They are for a set of brothers. The younger one is also due anytime now. He gets the animal quilt. Big brother is just over a year. He gets the trains.

As for as non-baby quilts, I need to work on my Sylvia's Bridal Sampler swap blocks. I got the blue fabric washed and picked out for all but one block. I will need to stop by the store to pick up a white background though. Tonight, if I remember, I'll measure how much I need of it. I'm doing 10 sets of 6 plus 1 extra. That gives me 5 of each to swap, 1 of each to keep, and an extra for the author's quilt. I also need to check on the label directions and pick up fabric for that.

So that's the rest of my July. Finish three baby quilts, start two more, and make 61 6" SBS blocks.

~~QB29

Friday, July 06, 2007

Still Stitchin'

Well, I'm still stitching on nephew's train quilt. I need to finish tying off the knots and finish the binding. I did get the rest of the train fabric cut last night for another quilt. Now I just need to cut the sashing. I am one block short (or 5 if I do the bigger version) of what I need for train quilt No. 2, but I have a pattern for piecing a locomotive that I will use for the remaining block(s). The sashing will be pieced - black & brights.

Tonight/this weekend I am focusing on babies :-D. I am going to finish nephew's train quilt. I am going to piece the Paddington Bear top and prep it for basting. I need to lay out the batting some so it relaxes before I can actually baste. I am going to cut & piece train #2 and get that ready for basting as well. The other project I've got doing for this week is my Sylvia's Bridal Sampler Swap blocks. I'm signed up to do ten sets and need to have them in next month. The theme is blue and white. I hope to get four or five sets completed this weekend (thats 24 - 30 6" blocks - 5 each to swap plus one for me :-D). By Sunday night I hope to have the two baby quilts basted, nephew finished, and be at least half way done with SBS (or at least close to it).

Busy, but fun weekend :-). We've got VBS next week so I'll have to work extra hard this weekend since quilting won't be an option next week.

Oh, yeah, I almost forgot. I'm going to camp!!!!! Yesterday in the mail I got info on a quilt camp I've been wanting to attend. They have three sessions each year and the fall one is coming up!!!! I'll be there four days/three nights just to sew and quilt and have fun :-D. Yeah me!!!!

~~QB29

Monday, July 02, 2007

Weekend Work

I was sick a little over the weekend (sinus infection :-() so my free time was spent sleeping, not sewing. I did, however, manage to finish the quilting on the train quilt. I also cut and pieced the binding. I will do the binding tonight when I meet my friend. She's been working on a quilt for her youngest and is to the binding point. I just need to show her how to do it. Then she'll be done!!!. I figured since I'm at that point I may as well use my quilt as an example and show her hands-on how to do it.

This week I hope to finish piecing the Paddington Bear quilt. I also hope to get 3 more boys quilts made up. I want to give one both the June and the July baby boys at church as well as give one to a special one year old and his new brother who's coming any week now. So that's four I need to do this month! However, the walking foot works great to machine quilt really fast. I just need to remember to very carefully baste and to go slow and smooth out the quilt as I'm quilting. I should be able to do it though.

After that I've got a full page list of projects to work on. I want to make some fabric books up for Bubby. I've got three panels (ABC, Paddington Bear, Shapes) and two applique patterns (Another ABC, Activities) to do. I also want to make him a growth chart that matches the quilt.

For my mom I'm working on her lap throw and placemats and a rooster wall hanging. For sister I want to do some placemats/pot holders/table runner for her kitchen and table. That will probably be the next project I do.

For dad I also want to do some new placemats. I also want to make him a bed size quilt but that may be pushing it. Same with my uncle.

Of course, I've still got my bed quilt to start.

It's gonna be a busy week!

~~QB29

Friday, June 29, 2007

Picture


Here is a picture of Bubby's quilt! The blue area actually says his name, but for privacy reasons I marked it out.

~~QB29

Thursday, June 28, 2007

Late night last night

Well, I did not get to the walking foot last night, but I got other stuff done!!!!! I decided on a pattern for the Paddington Bear quilt and got all but the inner border cut. Since the outer border is a real cute print, I am going to wait on the inner border until I can see exactly what it needs to be for the outer border to look right. I am doing a snowball/hourglass layout in a 5 X 5 design with the snowballs making the big X. The snowballs are the Paddington Bears on yellow, fussy cut (obviously :-)) with green corners. The hourglasses are blue and red. I'm not sure which I'll have turned out yet. Whichever one I have turned out so that it touches the inner border will be the other color. So the inner border is either red or blue. The outer border is a Paddington Print from the strip. It is Paddington Bears on light blue. The backing is the yellow Paddington Outline print. I started marking the diagonal line on my green squares that I'm using for the snowball corners, but that's as far as I got.

I also cut and pieced the backing for my mom's quilt.

I also decided to make an I spy quilt for a very special little boy who just turned one and a baby quilt for his little brother who will be coming any day now. I hope to get those done in July and mailed off by the end of July.

Well, that's all for now!
~~QB29

Wednesday, June 27, 2007

Change of Plans

So while being gone a day and a half from work gives me lots of sewing time, it also puts me really behind, which means I'm working late tonight :-(. I'm planning on staying here unitl I get me desk cleared off with everything that can be done tonight or 6:30 PM, which is the latest I can stay and still make it to church with time to breathe :-). Service actually starts at 7:00, but with traffic, parking, walking in, and getting my choir book ready, I need to allow at least 15 minutes. Plus I like to say hello to others.

The good news? I picked up a walking foot at lunch! I hope to use it tonight after the service. I should probably be smart and make a little quilt sandwich to practice on, but you know me....impatient, impatient, impatient. We'll see how it goes, lol.

If I can't get the walking foot going tonight, I hope to cut up Paddington. I might even get that pieced tonight if all goes well. I might make a similar pattern to the train quilt I've just finished. Maybe being the keyword here. But I did like how the train quilt ended up being, so we'll see. I promise to post pictures ASAP! I need to post one still back from the blue and white flannel one from last winter as well as Bubby's and the train quilt. If I think about it I will take pictures tonight of my works in progress I'm working on. That is, if my camera is cooperating. I may need to charge the batteries.

bye bye for now,
QB298

Tuesday's Accomplishments

Well, I did not get anything accomplished that I had planned on doing Monday night. Instead I was asleep fighting off a virus. I had to take Tuesday off, but was well enough to sew :-). I pressed, cut, pieced, and basted the railroad quilt top. It is ready to be quilted. I called the sewing machine store about a Walking Foot this morning and will be able to pick one up this afternoon. It's $75!!!! Luckily I've got a 25% off coupon that the lady said I could use and my mom said she'd buy it for me for an upcoming present. Sweet :-).

I hope to get started quilting it tonight and finish it on Friday. I won't be doing much tonight as I've got church and tomorrow I have to run around all evening. So between a few hours tonight and all Friday evening I should be able to finish quilting it. Then I will just need to attach the binding and add a label. I'm thinking for doing a series of generic labels for the church babies unless I'm close to the mom. Something along the lines:
“Lo, children are an heritage of the LORD” Psalm 127:3a
Stitched with Prayers for ___________. You are a special gift from God.

Made by ____________, (date), (location)

Besides quilting the train quilt, I hope to get the Paddington Bear quilt top made so I can machine quilt that one next week. I also need to get mom's backing pieced so I can get that one quilted in July.

Coming up on the quilt schedule:
June baby boy - quilt/bind/label
July baby boy - press/cut/piece/baste/quilt/bind/label
(Christmas) Mom's lap throw - piece backing/baste/quilt/bind/label
Oct baby girl (1) - finish hand quilting
Oct baby girl (2) - decide on pattern/fabric/wash/press/cut/piece/baste/quilt/bind/label
Oct baby unknown - holding pattern until known
Jan baby unknown (1) - holding pattern
Jan baby unknown (2) - holding pattern
(Bday) Mom's placemats - holding pattern until Summer baby quilts finished
(Christmas) Dad's bed quilt - faux log cabin pattern, scrappy, need to cut F.Q./scraps into strips
(Christmas) Uncle's Bed quilt - need to decide on pattern
(Bday) Sister - placemats/pot holders/table runner - "roosters/country"
(Christmas) Sister - lap throw - haven't a clue

I need to check with my Aunt to see if my little cousins play with dolls and which size(s) - I'd like to make them each a little doll quilt for their bdays (late this summer). For Christmas I might make each of them something else. I don't know.

Oh, and my mom mentioned a real cute class she's interested in doing. It's to make a little roadway playmate that folds up into a backpack. That's in August. That will be for nephew (will mom's will anyway, mine will have to be for the special baby menioned in all my first posts :-D) He'll be two soon!!!!)

Adios,
QB29

Monday, June 25, 2007

Weekend Accomplishments

Well my sister loved Bubby's quilt. She said she can't let his daddy see or else he'd want it for himself. I'm really glad she liked it. She had no idea it was coming. Bubby was good staying with us, but then again, he's always good :-). Okay, so I just see it that way because he's my nephew, but hey, I'm supposed to be biased ;).

I did get to stop by the store for fabric. I purchased some of the Paddington Bear line. I got it washed at Mom's too. Tonight I plan to iron and cut, and I hope to piece the top tomorrow. That will let me baste it Wednesday. I need to baste Mom's quilt this week too - I got her fabric washed over the weekend. I did get some work done on the purple & white quilt :-D.

So here are my goals for tonight:
1. Press Paddington Bear fabric.
2. Cut Paddington Bear fabric.
3. Press Mom's backing fabric.
4. Cut backing fabric and piece together.
5. Baste Mom's quilt.

That's it for tonight: ironing, cutting, and basting :-) with a tiny bit of sewing to make the back.

~~QB29

Friday, June 22, 2007

Completely Not Quilting

Right now I am hooked up to the platelet/plasma machine at the blood center. They are doing a double platelet donation. It is really hard to type one handed, left hand to boot. I am thinking of all the quilting I am going to do tonight. Maybe. It depends on how well I can bend my arm. I at least will be able to wash mom's fabric and baste her quilt. I also need to wrap Bubby's quilt up for him. I'm gonna tease my sister and give her a dummy "I love Bubby" present, wrapped up all pretty in a bag or box big enough for the quilt. I'll act all surprised when only the small board book is in the bag and then be like, "you know, there should have been something else there," and then pull out another present. My mom and I will be keeping Bubby overnight :-D.

Well, I'm tired of typing one handed so that's all for now. I think I'll surf the web some.

~~QB29

Goals for the Weekend

I'll be pretty busy this weekend, so I won't get much quilting done. I'll be much too busy watching my Bubby play with his brand new quilt :-) I do have a few goals, though, in addition to what I just mentioned. I hope to buy the fabric for June Baby Boy - either tomorrow or Sunday. I also hope to get it washed & pressed. Next week will be pretty busy for me too, so I'll have to work quick to get it done.

~~QB29

Thursday's Accomplishments/Friday's Goals

Well, I got some of my list accomplished.
1. I finished piecing Mom's top.
2. Pressed purple & white quilt for Oct. Baby girl.
3. Put purple & white quilt in frame and quilted about 1 1/2 hours.
4. Went to store and picked up batting for next several quilts. (was 50% off!)
5. Also got some safety pins - I just need to spend another $ to save $5 :-).
6. Got backing for Mom's quilt. It's the third time I've purchased this fabric - I can't believe it was still there. I must be the only one that likes it, lol.
7. Laid out batting for mom so it can relax.

Tonight my sewing/quilting plans are:
1. Wash Mom's backing fabric.
2. Baste Mom's quilt.
3. Finish top half of purple & white quilt.
4. Press & cut fabric for July baby boy.


All for now
~~QB29

Thursday, June 21, 2007

Quilting Goals 6/21/2007

Here are the quilting goals I have for tonight:
1. Piece and attach mom's outer border.
2. Find batting for mom & July baby boy (unfortunately my sewing area is a mess!) and let air out/relax.
3. Press fabric for July baby boy.
4. Cut fabric for July baby boy.
5. Piece top for July baby boy.
6. Find safety pins so I can baste.
7. Press backing and top for both quilts.
8. Make a shopping list if I can't find enough batting/safety pins

Well, that's quite a bit. I'll have to get moving as soon as I get off work. Whatever I don't get accomplished tonight, I'll do Friday night. I am scheduled to donate platelets, though, so it will depend on how long that takes and how sore my arm is from the needle. I may just have to forget about quilting for Friday and just get ready for my busy, busy weekend. I have to be out at the ball field at 9:15 in the morning to help with the concession stand. I'll be there until about noon. Then I will have about 2 - 2 1/2 hours free time. I'm hoping to run to a quilt store in a nearby city looking for fabric for June Baby Boy since the ones here in town don't have want I want. Then I have to be back at the ball field for my game and to help in the concession stand during the other games. After that I will be heading to see my Bubby :-) (that's my nickname for my nephew). If I can't get fabric Saturday I'll check some of the stores by Bubby on Sunday.

All for now
~~QB29

Current Projects

Here are my current projects I'm working on/planning to start this summer:
1. Baby Quilts Galore!!
We have several babies due in the next several months at church. A boy was born in June with another due in July. Two girls are expected in October while another two babies are due in January. I also have a college friend due in October, but I don't know what she is having yet. I have the fabric for the July baby but can't settle on any fabric for the June boy. I have a quilt that I started and never finished that I will use for one of the October girls and am trying to decide on a pattern/fabric for the other October girl. I haven't even thought yet of the January babies. Wow, 7 baby quilts in 6 months. That will be a record for me, lol. I hope to by the end of June have both boy quilts finished and given away.

2. Family
Since my family will never find this, I'll tell you what I'm making. I'm working on a lap quilt for my mom. I started it sometime last fall. I just need to piece the outer border and attach, baste, quilt, and bind. I will machine quilt it to get it done. I hope to have this for her birthday. For my dad and my uncle I am hoping to make bed quilts. They are sharing a house since the death of my stepmom this past spring. I would like to get a bed quilt done for my dad for something new for his room. These will both be for Christmas presents. I have some small things for my sister - placemats, picture frames that I would like to do.

3. Me
T-shirt quilt from college t-shirts. I ripped out the binding because I did not like it. I have some denim that I will use instead.
Bed quilt. I have the fabric and pattern for a quilt for my bed. Now I just need to do it!

That's all for now
~~QB29

Nephew's Quilt is All Finished.

Wow, it has been a long time since I last posted. I haven't done too much quilting in the past year. I did start several projects, but never finished them. So goes the life of a quilter. The only project I did finish was a baby quilt for my very special nephew. I started it before he was born but because of work put it aside. Well, he's 8 months old now and will be getting his quilt this weekend!!!! I will put a picture up when I get one taken. His quilt is machine pieced and appliqued and hand quilted. The front is 100% cotton while the back is flannel. When I have more time I will list what projects I'm working on and get pictures up, so that's all for now.


~~